The road structure on the Bucharest Beltway sector between A1 (km 55+520) and km 54+700 will be reinforced as follows: 28cm recycling and stabilization; – 8cm AB31.5 geocomposite base course; – 6cm BAD binder course; 5cm MAS wearing course. The car park at km 54+765 will have access from the roundabout on the Bucharest Beltway via a link road to ensure access from all directions. The road structure of the link road will be the same as that of the CB.

Detalii proiect

  • Project Name: Widening To 4 Lanes, Bucharest, DNCB - intersection with A1 motorway
  • Completion date: June 2023
  • Location: Bucharest, DNCB - intersection with A1 motorway
  • Sector: Infrastructure
  • Surface area: 820 ml having approx. 17,000 sqm; short term parking approx. 14,000 sqm

Descriere

The road structure on the Bucharest Beltway sector between A1 (km 55+520) and km 54+700 will be reinforced as follows: 28cm recycling and stabilization; – 8cm AB31.5 geocomposite base course; – 6cm BAD binder course; 5cm MAS wearing course. The car park at km 54+765 will have access from the roundabout on the Bucharest Beltway via a link road to ensure access from all directions. The road structure of the link road will be the same as that of the CB.

Detalii proiect

  • Project Name: Widening To 4 Lanes, Bucharest, DNCB - intersection with A1 motorway
  • Completion date: June 2023
  • Location: Bucharest, DNCB - intersection with A1 motorway
  • Sector: Infrastructure
  • Surface area: 820 ml having approx. 17,000 sqm; short term parking approx. 14,000 sqm